TRAFFIC ADVICE
Temporary Traffic Arrangement on Stubbs Road, Wan Chai

        Motorists are advised that to facilitate road works, the following road sections on Stubbs Road will be temporarily converted from two-lane two-way traffic into one-lane two-way traffic during the time specified below:

Period Road Section
From 11.00 pm to 6.00 am of the following day daily between 15 June 2026 and 7 July 2026 on Mondays to Fridays (except public holidays) A section of Stubbs Road between lamppost nos. 24336 and 47051
From 1.30 am to 6.00 am daily between 8 July 2026 and 15 July 2026 on Mondays to Fridays (except public holidays) A section of Stubbs Road near Craigmount


Appropriate traffic signs will be erected on site to guide motorists.