Motorists are advised that in order to facilitate the drainage works, the following traffic lanes will be closed to all vehicular traffic from 1.30 am to 5.00 am daily on every Mondays to Saturdays (except public holidays) from 26 June 2026 to 30 September 2026:
a. The traffic lane of about 40 metres on Yeung King Road eastbound near Ming Kum Road; and
b. The middle lane of about 35 metres on Ming Kum Road northbound near Yeung King Road.
Appropriate traffic signs will be erected on-site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.