Traffic Advice
Temporary Traffic and Transport Arrangements in Tai Po


        Members of the public
are advised that to facilitate road works, the following temporary traffic and transport arrangements will be implemented during the periods as specified below:

        (I)    From 10.00 pm on 25 June 2026 to 6.00 am on 26 June 2026

(a)    Lane Closure

The slow lane of Dai Cheong Street eastbound from a point about 60 metres east of its junction with Dai Fu Street to a point about 225 metres east of the same junction will be temporarily closed.

(b)   Relocation of Overnight Goods Vehicle Parking Spaces

The overnight goods vehicle parking spaces on the northern kerbside lane of Dai Cheong Street eastbound from a point about 30 metres east of its junction with Dai Fu Street to a point about 120 metres east of the same junction will be temporarily relocated to the western kerbside lane of Dai Shing Street northbound from a point about 35 metres south of its junction with Dai Cheong Street to a point about 105 metres south of the same junction and the eastern kerbside lane of Dai Fat Street southbound from a point about 45 metres south of its junction with Dai Cheong Street to a point about 95 metres south of the same junction.

(c)    Public Transportation Arrangement

The bus stop of KMB Route No. 72A on Dai Cheong Street eastbound near Oriental Press Centre will be temporarily relocated for about 25 metres eastwards. Passengers may also take the existing green minibus services near the relocated bus stop.

        (II)   From 10.00 pm on 29 June 2026 to 6.00 am on 30 June 2026

(a)    Lane Closure

The fast lane of Dai Cheong Street eastbound from a point about 60 metres east of its junction with Dai Fu Street to a point about 225 metres east of the same junction will be temporarily closed.

(b)   Relocation of Overnight Goods Vehicle Parking Spaces


The overnight goods vehicle parking spaces on the northern kerbside lane of Dai Cheong Street eastbound from a point about 30 metres east of its junction with Dai Fu Street to a point about 120 metres east of the same junction will be temporarily relocated to the western kerbside lane of Dai Shing Street northbound from a point about 35 metres south of its junction with Dai Cheong Street to a point about 105 metres south of the same junction and the eastern kerbside lane of Dai Fat Street southbound from a point about 45 metres south of its junction with Dai Cheong Street to a point about 95 metres south of the same junction.

        (III)  From 10.00 pm on 2 July 2026 to 6.00 am on 3 July 2026

(a)    Lane Closure


The following lanes will be temporarily closed:

      1. the slow lane of Dai Cheong Street eastbound from its junction with Dai Kwai Street to a point about 155 metres west of the same junction; and
      2. the slow lane of Dai Kwai Street northbound from a point about 50 metres south of its junction with Dai Cheong Street to a point about 15 metres north of the same junction.
(b)   Public Transport Arrangement

The bus stop of KMB Route No. 72A on Dai Cheong Street eastbound near Oriental Press Centre will be temporarily relocated for about 25 metres westwards. Passengers may also take the existing green minibus services near the relocated bus stop.

        (IV)  From 10.00 pm on 6 July 2026 to 6.00 am on 7 July 2026

(a)    Lane Closure


The following lanes will be temporarily closed:

  1. the fast lane of Dai Cheong Street eastbound from its junction with Dai Fat Street to a point about 135 metres east of the same junction; and
  2. the slow lane of Dai Fat Street southbound from its junction with Dai Cheong Street to a point about 75 metres north of the same junction.
(b)   Relocation of Overnight Goods Vehicle Parking Spaces


The overnight goods vehicle parking spaces on the northern kerbside lane of Dai Cheong Street eastbound from a point about 100 metres east of its junction with Dai Fat Street to a point about 170 metres east of the same junction will be temporarily relocated to the western kerbside lane of Dai Shing Street northbound from a point about 35 metres south of its junction with Dai Cheong Street to a point about 105 metres south of the same junction and the eastern kerbside lane of Dai Fat Street southbound from a point about 45 metres south of its junction with Dai Cheong Street to a point about 95 metres south of the same junction.

        Appropriate traffic signs will be erected on site to guide motorists. Notices will be displayed by the public transport operators to inform passengers of the above arrangements concerned.