Traffic Advice
Temporary Traffic Arrangements on Tai Lin Pai Road, Kwai Chung
Motorists are advised that to facilitate drainage works, the following temporary traffic arrangements will be implemented on Tai Lin Pai Road, Kwai Chung from 8.00 pm to 6.00 am of the following day daily during the period from 2 July 2026 to 20 September 2026 (except Public Holidays):
(I)
Lane Closure
- The middle lane of Tai Lin Pai Road southbound from its junction with Kwai Cheong Road to a point about 80 metres north of the same junction will be temporarily closed to all vehicular traffic.
(II)
Temporary Suspension of bus parking spaces
- Two bus parking spaces on the eastern kerbside lane of Tai Lin Pai Road near Tai Lin Pai Road Substation will be temporarily suspended.
Motorists could use the remaining lane of the above road section. Appropriate traffic signs will be erected on site to guide motorists.