Traffic Advice

Temporary Traffic and Transport Arrangement
on Cheung Shan Estate Road West, Tsuen Wan


        Members of the public are advised that to facilitate road works, the following temporary traffic and transport arrangements will be implemented on Cheung Shan Estate Road West from 9.00 p.m. on 15 July 2026 to 5.30 a.m. of the following day:

Lane Closure

    1. The slow lane of Cheung Shan Estate Road West (eastbound) between Wo Yi Hop Interchange and Sau Shan House, Cheung Shan Estate will be temporarily closed to all vehicular traffic.

Public Transport Arrangement

    1. The bus stops of KMB route no. 32(Tsuen Wan (Shek Wai Kok) – Olympic Station) (both bounds), 32M (Kwai Fong Station – Cheung Shan (Circular)) and 36 (Tsuen Wan West Station – Lei Muk Shue (Circular)) will be temporarily relocated to Wo Yi Hop Interchange near lamp post no. FA5979;
    2. KMB route nos. 32 (both bounds), 32M and 36 will be diverted to skip Cheung Shan Estate Road West.
    3. The GMB stop of GMB route no. 82M (Tsuen Wan (Shiu Wo Street – (Cheung Shan)) (Tsuen Wan (Shiu Wo Street) bound) on Cheung Shan Estate Road West (eastbound) near Sau Shan House, Cheung Shan Estate will be temporarily suspended; and
    4. The taxi stand on Cheung Shan Estate Road West (eastbound) near Sau Shan House, Cheung Shan Estate will be temporarily suspended.

        Appropriate traffic signs will be erected on site to guide motorists. The public transport operators will display notices to advise passengers of the temporary arrangement.