Traffic Advice
Temporary Traffic Arrangements on Lantau Link, North West Tsing Yi Interchange and Cheung Tsing Highway

          Motorists are advised that to facilitate road maintenance works, the following temporary traffic arrangements will be implemented on Lantau Link, North West Tsing Yi Interchange and Cheung Tsing Highway during the time specified below:

Date and Time

Location

From midnight to 6.00 am daily during the period from 21 July to 14 August 2026
(Except Mondays, Saturdays and Sundays)

Part of the traffic lane on Lantau Link to Cheung Tsing Highway (Kowloon Bound) between Tsing Ma Bridge (near Tsing Yi Tower) and Cheung Tsing Highway junction with Tsing Sha Highway will be temporary closed.

From midnight to 6.00 am daily during the period from 22 July to 14 August 2026
(Except Mondays, Saturdays and Sundays)

Part of the traffic lane on North West Tsing Yi Interchange to Cheung Tsing Highway (Kowloon Bound) between North West Tsing Yi Interchange junction with Lantau Link and Cheung Tsing Highway (near Transport Department Vehicle Examination Complex) will be temporary closed.

* The lane closure arrangement will be implemented only in one of above road sections of Lantau Link, North West Tsing Yi Interchange and Cheung Tsing Highway during the period from 22 July to 14 August 2026 (Except Mondays, Saturdays and Sundays), depending on the works progress.

          Motorists are advised to use the lower deck carriageway of Lantau Link to Kowloon when it is open (except vehicles transporting dangerous goods belonging to Category 1, 2, 3 or 3A).

          Motorist are also advised to stay alert to the latest traffic news through the media or the TD's mobile application "HKeMobility" or website (www.td.gov.hk). Appropriate traffic signs will be erected on site to guide motorists.