Traffic Advice
Temporary Traffic Arrangements on Luen Cheong Street and Wo Tai Street, Fanling
Members of the public are advised that to facilitate watermains laying works, the following temporary traffic arrangements will be implemented on Luen Cheong Street and Wo Tai Street at the time specified below:
1. Road Closure
- The eastern kerbside lane of Wo Tai Street from its junction with Luen Cheong Street to a point about 40 metres south of the same junction will be temporarily closed to all vehicular traffic from 10.00 a.m. on 30 July 2026 to 10.00 a.m. on 10 August 2026; and
- The southern kerbside lane of Luen Cheong Street from its junction with Wo Tai Street to a point about 30 metres east of the same junction will be temporarily closed to all vehicular traffic from 10.00 a.m. on 10 August 2026 to 10.00 a.m. on 21 August 2026.
2. Relocation of Goods Vehicles Metered Parking Spaces
2 metered parking spaces for goods vehicles (nos. 25044A and 25044B) on Luen Cheong Street will be temporarily relocated outside No. 27-33 Luen Hing Street from 10.00 a.m. on 30 July 2026 to 10.00 a.m. on 21 August 2026.
Appropriate traffic aids will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive in utmost care.