Traffic Advice
Extension of Temporary Traffic and Transport Arrangements on Man Kam To Road, North District
Motorists are advised that, to facilitate sewerage works, the following temporary traffic and transport arrangements will continue to be implemented on Man Kam To Road from 6 p.m. on 30 July 2026 to 6 p.m. on 12 September 2026:
Road ClosureThe slow lane of Man Kam To Road northbound from a point about 60 metres north of its junction with Sha Ling Road to a point about 135 metres north of the same junction will be temporarily closed to all vehicular traffic.
Public Transport ArrangementsAppropriate traffic signs will continue to be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.