TRAFFIC ADVICE
Temporary Traffic Arrangements in Pak Tai Street, To Kwa Wan

        Motorists are advised that to facilitate with construction works, with effect 10.00 am on 1 August 2026 to 6.00 pm on 31 January 2027, the following temporary traffic arrangements will be implemented:

Parking Spaces Relocation

The following parking spaces will be temporarily relocated:

    1. Two bus metered parking spaces (nos. 8762AB) at Pak Tai Street Car Park (Open) will be temporarily relocated to Kowloon City Road outside Harbour Plaza 8 Degrees.

    2. 24 motorcycle parking spaces in Pak Tai Street will be temporarily relocated 70 metres southwards to outside Sky Tower Block 1; and

    3. 10 motorcycle parking spaces on Kowloon City Road near Harbour Plaza 8 Degrees will be temporarily relocated to Pak Tai Street outside Sky Tower Block 1.

Taxi Pick-up / Drop-off Point Relocation

The taxi pick-up / drop-off point in Pak Tai Street near Sky Tower Block 2 will be temporarily relocated to Mok Cheong Street outside Sky Tower Block 1.

       Appropriate traffic signs and road markings will be erected on site to guide motorists.