Motorists are advised that to facilitate road works, the following temporary traffic arrangements will be implemented at the Tseung Kwan O Tunnel and Tseung Kwan O Tunnel Road on the following days:
|
Date |
Time |
Traffic Arrangement |
| 11 and 18 August 2026 | From 12.30 am to 5.00 am daily |
The Tseung Kwan O bound tunnel tube of Tseung Kwan O Tunnel and the slow lane of Tseung Kwan O Tunnel Road (Tseung Kwan O bound) will be temporarily closed One-tube-two-way operation will be implemented at the Kwun Tong bound tunnel tube
|