Traffic Advice
Temporary Traffic Arrangement on Tsing Long Highway
Motorists are advised that to facilitate road works, part of traffic lanes of Tsing Long Highway southbound from about chainage marker 22.0 to the entrance of Tai Lam Tunnel southbound tunnel tube will be temporarily closed to all vehicular traffic from 11.00 p.m. to 6.00 a.m. of the following day daily on 28 August 2026, 4 September 2026, 5 September 2026 and 11 September 2026. Affected motorists may use the remaining traffic lanes during the above-mentioned period.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to drive with care and patience.