Traffic Advice
Temporary Traffic Arrangements on the
Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road (Zhuhai and Macao bound)
Motorists are advised that the following temporary traffic arrangements will be implemented in stages, from 9.00 am to 6.00 pm daily during the period from 7 September 2026 to 30 November 2026, on the Hong Kong-Zhuhai-Macao Bridge ("HZMB") Hong Kong Link Road ("HKLR") (Zhuhai and Macao Bound) to facilitate road works:
- the left and middle lanes of the above road section between chainage marker 9.2W and chainage marker 8.35W will be temporarily closed to all vehicular traffic, while the right lane will not be affected;
- the middle and right lanes of the above road section between chainage marker 8.35W and chainage marker 5.3W will be temporarily closed to all vehicular traffic, while the left lane will not be affected;
- the left and middle lanes of the above road section between chainage marker 3.85W and chainage marker 3.25W will be temporarily closed to all vehicular traffic, while the right lane will not be affected;
- the middle and right lanes of the above road section between chainage marker 3.25W and chainage marker 1.65W will be temporarily closed to all vehicular traffic, while the left lane will not be affected;
- the left and middle lanes of the above road section between chainage marker 2.9W and chainage marker 0.7W will be temporarily closed to all vehicular traffic, while the right lane will not be affected; and
- the middle and right lanes of the above road section between chainage marker 0.7W and chainage marker 0.0W will be temporarily closed to all vehicular traffic, while the left lane will not be affected.
Motorists are advised to drive with care and patience. Appropriate traffic signs will be provided at the road section concerned on site to guide motorists.