Traffic Advice
Temporary Traffic Arrangements on Shun Long Road

          Motorists are advised that to facilitate the construction of Tung Chung New Town Extension – Tai Ho Interchange, a section of slow lane of Shun Long Road northbound from its junction with North Lantau Highway westbound to a point about 200 metres west of the same junction will be temporarily closed to all vehicular traffic from 10 a.m. on 14 September 2026 to 4 p.m. on 28 September 2026.

          Motorists are advised to travel via the remaining traffic lanes of Shun Long Road during the above-mentioned time periods.

          Appropriate traffic signs will be provided on site to guide motorists.