Motorists are advised that, to facilitate the construction works for the Development of Lok Ma Chau Loop, 9 metered parking spaces (no. 24501A, 24501B, 24502A, 24502B, 24503A, 24504A, 24504B, 24505A and 24505B) at Lok Ma Chau Road near Lok Ma Chau Path, Yuen Long will be temporarily suspended from 8.00 a.m. on 4 September 2026 to 4.00 p.m. on 30 November 2026.
Appropriate traffic signs will be erected on site to guide motorists.