To facilitate road works, motorists are advised that the following temporary traffic arrangements will be implemented on Cheung Tsing Highway and Tsing Sha Highway during the time specified below:
|
Date and Time |
Locations |
| From 10.00pm to 6.00 am of the following day daily from 15 to 22 September 2026 (except Sundays and Public Holidays) |
I. Road Closure (i) Parts of the traffic lanes of Cheung Tsing Highway (Kowloon bound) between the south bridge tower of Ting Kau Bridge and the western exit of Cheung Tsing Tunnel will be temporarily closed. |
| From 10.00pm to 6.00 am of the following day daily from 15 to 22 September 2026 (except Sundays and Public Holidays) |
I. Road Closure (i) Parts of the traffic lanes of Tsing Sha Highway (Airport bound) between the west bridge tower of Stonecutters Bridge and Nam Wan Tunnel will be temporarily closed. |