Traffic Advice
Temporary Traffic Arrangements on Fanling Highway, North District

       Motorist are advised that, to facilitate the road works, the slow lane of Fanling Highway eastbound from a point about 210 metres west of its junction with Kwu Tung North Road to a point about 200 metres east of the same junction will be temporarily closed to all vehicular traffic from midnight to 5.30 a.m. on 25 September 2026.

       Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.