Members of the public are advised that to facilitate the lift construction works, a section of the fast lane of Castle Peak Road – Tsing Lung Tau westbound opposite to Sea Crest Villa Phase 4 will be temporarily closed to all vehicular traffic from 10.00 a.m. on 2 October 2026 to 10.00 a.m. on 1 December 2026.
Motorists could still use the remaining traffic lane of the above road section during the above lane closure.
Appropriate traffic signs will be erected on site to guide motorists.