Motorists are advised that to facilitate drainage works, the following temporary traffic and transport arrangements will continue to be implemented in Kwun Tong daily from 9.00 pm to 5.30 am during the period from 1 October 2026 to on 31 December 2026 (Mondays to Fridays, except public holidays).
The traffic lane of Tsui Ping Road northbound from a point about 40 metres south of its junction with the unnamed access road leading to Tsui Nam House to a point about 150 metres south of the same junction will be temporarily closed to all vehicular traffic.
The section of Tsui Ping Road of about 110 metres near Tsui Yue House will be temporarily converted from two-lane two-way traffic into one-lane two-way traffic.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to observe the instruction and drive with utmost care. Notices will also be displayed by public transport operators to advise passengers of the above arrangements.