Traffic Advice
Extension of Temporary Closure of Pedestrian Subways near the Junction of Che Kung Miu Road, Lion Rock Tunnel Road and Tai Chung Kiu Road and Footpaths near Lion Rock Tunnel Road

        Members of the public are advised that, to facilitate the construction of Trunk Road T4, the following pedestrian subways and footpaths will continue to be temporarily closed from 2 pm on 30 October 2026 to 2 pm on 30 October 2027:

        Affected pedestrians will be diverted via other nearby footpaths, pedestrian subways and pedestrian crossings.  Appropriate traffic signs will be erected on site to guide pedestrians.