Members of the public are advised that, to facilitate drainage works, the following temporary traffic and transport arrangements will be implemented on Ping Che Road from 10 a.m. on 14 November 2026 to 6 p.m. on 29 January 2027:
Traffic Arrangement
Ping Che Road from a point about 40 metres north of its junction with Kong Nga Po Road to a point about 80 metres south of the same junction will be temporarily converted to one-lane two-way traffic.
Banning of Turning Movement
All vehicles with length over 10 metres on the unnamed access road eastbound near Lee Uk Village will be prohibited from turning right onto Ping Che Road southbound.
Traffic Diversion
Affected vehicles on the unnamed access road eastbound near Lee Uk Village heading for Ping Che Road southbound will be diverted via Ping Che Road northbound, Lin Ma Hang Road eastbound, Heung Yuen Wai Highway roundabout, Lin Ma Hang Road westbound and Ping Che Road southbound.
Public Transport Arrangements
Appropriate traffic signs and road markings will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.