Traffic Advice
Temporary Traffic Arrangements on Fanling Highway, North District
Motorists are advised that, to facilitate road works, the fast lane of the section of Fanling Highway westbound from a point about 2500 metres east of its junction with Pak Shek Au Elevated Road to a point about 30 metres east of the same junction will be temporarily closed to all vehicular traffic from 7.00 a.m. to 4.00 p.m. daily on 15 November 2026 and 13 December 2026.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.