Traffic Advice
Temporary Traffic Arrangements on North Lantau Highway


Motorists are advised that in order to facilitate the construction of Tung Chung New Town Extension – Tai Ho Interchange, a section of slow lane of North Lantau Highway eastbound from its junction with the slip road leading to Siu Ho Wan Depot to a point about 700 meters east of the same junction will be temporarily closed to all vehicular traffic from 10.00 a.m. to 4.00 p.m. daily from 24 to 27 November 2026 and 30 November 2026.

Motorists can travel via the remaining traffic lanes of North Lantau Highway during the above periods.

Appropriate traffic signs will be provided on site to guide motorists.