Traffic Advice
Temporary Traffic and Transport Arrangements on Tsuen Wan Road and Hing Fong Road, Kwai Chung
Motorists are advised that to facilitate road works, the following temporary traffic and transport arrangements will be implemented on Tsuen Wan Road and Hing Fong Road from 9.00 pm to 5.30 am of the following day daily on 11 and 13 November 2026:
(I)
Road Closure
The following road sections will be closed to all vehicular traffic:
- The slow lane of Tsuen Wan Road southbound from its junction with Hing Fong Road to a point about 98 metres north of the same junction; and
- The slow lane and the second left lane of Hing Fong Road eastbound from its junction with Tsuen Wan Road southbound to a point about 120 metres east of the same junction.
(II)
Banning of Turning Movement
- All vehicles will be temporarily prohibited from making left turn from Tsuen Wan Road southbound onto Hing Fong Road eastbound.
(III)
Traffic Diversion
- Affected vehicles travelling from Tsuen Wan Road southbound heading for Hing Fong Road eastbound will be diverted via Kwai Tsing Road westbound, Kwai King Road southbound, Kwai Tai Road southbound, Container Port Road eastbound and Kwai Fuk Road northbound.
(IV)
Public Transport Arrangement
- Long Win Bus Route Nos. A30 and NA30 (Lei Muk Shue bound) will be diverted via Tsing Ma Bridge eastbound, Tsing Sha Highway (Route 8), slip road leading to Tsing Yi and Container Terminal 9, Tsing Sha Highway northbound, Tsing Yi Road northbound, Tsing Yi Interchange, slip road, Tsing Yi Bridge and Kwai Tsing Road eastbound before resuming their original routeings.
Motorists are advised to drive with utmost care and patience. Appropriate traffic signs will be erected on site to guide motorists. Public transport operators will display notices to advise passengers of the above temporary arrangements.