Transport Department Notice
Temporary Traffic and Transport Arrangements on Tsuen Wan Road and Kwai Chung Road, Kwai Chung
Motorists are advised that to facilitate vehicular bridge construction works, the following temporary traffic and transport arrangements on Tsuen Wan Road and Kwai Chung Road will be implemented during the periods as specified below:
(I) Road Closure
The following road sections will be closed to all vehicular traffic:
(A) From 0.01 am to 5.30 am daily from 23 to 25 November 2026
- The middle and fast lane of Tsuen Wan Road eastbound from about chainage marker 14.9 to Kwai Chung Road about chainage marker 14.0;
- The slip road leading from Tsuen Wan Road southbound to Tsuen Wan Road eastbound;
- The slip road leading from Hing Fong Road southbound to Tsuen Wan Road eastbound; and
- The slip road leading from Kwai Tsing Road northbound to Tsuen Wan Road eastbound.
(B) From 0.01 am to 5.30 am daily from 26, 30 November and 1 December 2026
- The slow lane and middle lane of Tsuen Wan Road eastbound from about chainage marker 14.6 to Kwai Chung Road southbound about chainage marker 14.0;
- The slip road leading from Hing Fong Road southbound to Tsuen Wan Road eastbound; and
- The slip road leading from Kwai Tsing Road northbound to Tsuen Wan Road eastbound.
(C) From 0.01 am to 5.30 am daily from 2 to 4 December 2026
- The leftmost lane of Kwai Chung Road southbound from about lamp post number BC1210 to Kwai Chung Road southbound about chainage marker 14.0.
(II) Banning of Turning Movement
(A) From 0.01 am to 5.30 am daily from 23 to 25 November 2026
- All vehicles will be temporarily prohibited from making left turn from Hing Fong Road southbound onto Tsuen Wan Road eastbound; and
- All vehicles will be temporarily prohibited from making right turn from Kwai Tsing Road northbound onto Tsuen Wan Road eastbound.
(B) From 0.01 am to 5.30 am daily from 26, 30 November and 1 December 2026
- All vehicles will be temporarily prohibited from making left turn from Hing Fong Road southbound onto Tsuen Wan Road eastbound; and
- All vehicles will be temporarily prohibited from making right turn from Kwai Tsing Road northbound onto Tsuen Wan Road eastbound.
(III) Traffic Diversion
(A) From 0.01 am to 5.30 am daily from 23 to 26, 30 November and 1 December 2026
- Affected vehicles on Hing Fong Road southbound heading for Kowloon will be diverted via Hing Fong Road southbound, Tsuen Wan Road westbound, Tsuen Tsing Interchange and Tsuen Wan Road eastbound; and
- Affected vehicles on Kwai Tsing Road northbound heading for Kowloon will be diverted via Tsuen Wan Road westbound, Tsuen Tsing Interchange and Tsuen Wan Road eastbound.
(B) From 0.01 am to 5.30 am daily from 2 to 4 December 2026
- Affected vehicles on Kwai Chung Road southbound heading for West Kowloon Highway will be diverted via Kwai Chung Road southbound, Container Port Road South Roundabout No. 3, Container Port Road South southbound, Container Port Road South Roundabout No. 4, Container Port Road South southbound, Container Port Road South Roundabout No. 5, Container Port Road South southbound, Container Port Road South Roundabout No. 6, Mei Ching Road eastbound, Mei Ching Road Roundabout and West Kowloon Highway.
(IV) Public Transport Arrangement
From 0.01 am to 5.30 am daily from 23 to 26, 30 November and 1 December 2026
- Citybus Route Nos. 930 (Exhibition Centre Station bound), N930 (Causeway Bay bound) and KMB Route Nos. 37 (Olympic Station bound) and N237 (Mei Foo bound) will be diverted via Hing Fong Road southbound, Tsuen Wan Road westbound, Tsuen Tsing Interchange and Tsuen Wan Road eastbound before resuming their original routeings.
Motorists are advised to drive with utmost care and patience. Appropriate traffic signs will be erected on site to guide motorists. Public transport operators will display notices to advise passengers of the above temporary arrangements.
TSE Wing-yee, Winnie Commissioner for Transport