Traffic Advice
Extension of Temporary Traffic Arrangements on Man Kam To Road, North District

Motorists are advised that, to facilitate sewerage works, the slow lane of Man Kam To Road northbound from about 400 metres south of its junction with Lin Ma Hang Road to a point about 340 metres south of the same junction near San Uk Ling Firing Ground will continue to be temporarily closed to all vehicular traffic from 6 p.m. on 30 November 2026 to 6 p.m. on 28 February 2027.

Appropriate traffic signs will continue to be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.