Traffic Advice
Temporary Traffic Arrangements on Tolo Highway and Tate's Cairn Highway

        Motorists are advised that to facilitate road works, the following traffic lanes will be temporarily closed to all vehicular traffic from 00.30 a.m. to 05.30 a.m. daily on 3, 4, 10 and 11 June 2026:

    1. The left-most lane of Tolo Highway (northbound) from a point about 100 metres south of its junction with Tate's Cairn Highway (northbound) to the same junction;
    2. The left-most lane of Tate's Cairn Highway (northbound) from a point about 300 metres south of its junction with Tolo Highway (northbound) to the same junction;
    3. The third lane of Tolo Highway (northbound) from its junction with Tate's Cairn Highway (northbound) to a point about 150 meters north of the same junction;
    4. The left-most lane of Tolo Highway (northbound) from its junction with Tate's Cairn Highway (northbound) to a point about 470 metres north of the same junction; and
    5. The left-most lane of Tolo Highway (northbound) from a point about 500 metres north of its junction with Tate's Cairn Highway (northbound) to a point about 1650 metres north of the same junction.

        Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive in utmost care.