Project Involving Major
Road Works
Gazettal Doc Progress
(Stage)
Outline Zoning Plans
Braemar Hill Pedestrian Link

HyD
e11-1.wd@hyd.gov.hk
3903-6660
Link Construction North Point
Central Kowloon Route

HyD
enquiry@ckr-hyd.hk
2762-3601
Link Construction Ho Man Tin
Kai Tak
Ma Tau Kok
South West Kowloon
Mong Kok
Yau Ma Tei
Development of
Anderson Road Quarry Site


CEDD
spro@arqaecom.com
9669-7120
Link Construction Kwun Tong (North)
Development of ex-Cha Kwo Ling Kaolin Mine Site

CEDD
enquiry@cedd.gov.hk
3842-7062
Link Construction Cha Kwo Ling, Yau Tong, Lei Yue Mun
Development of Lok Ma Chau Loop – land decontamination and advance engineering works

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Lok Ma Chau Loop
San Tin
Development of Lok Ma Chau Loop – Main Works Package 1

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Detailed Design & Construction Lok Ma Chau Loop
San Tin
Enhancing Connectivity near MTR Kwun Tong Station with Elevated Landscaped Pedestrian Deck

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Kwun Tong (South)
Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road

HyD
e4-3.wd@hyd.gov.hk
3903 6810
Link Construction Kwai Chung
Footbridge B along Tai Chung Road and Hoi Shing Road (6145TB-1)

HyD
e4-1.wd@hyd.gov.hk
3903 6802
Link Detailed Design Tsuen Wan
Formation, Roads and Drains in Area 54, Tuen Mun - Phase 1 Stage 2, Phase 2 Stage 4B and Stage 4C works

CEDD
enquiry@cedd.gov.hk
2762-5111
Link

Construction Tuen Mun
Dualling of Hiram's Highway from Marina Cove to Sai Kung Town

HyD
hh2.mw@hyd.gov.hk
5330-5232
Link Detailed Design Ho Chung
Hebe Haven
Pak Kong and Sha Kok Mei
Sai Kung Town
Hung Shui Kiu/Ha Tsuen New Development Area Advance Works Phase 2 - Site Formation and Engineering Infrastructure

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Hung Shui Kiu and Ha Tsuen
Hung Shui Kiu/Ha Tsuen New Development Area Stage 1 Works - Site Formation and Engineering Infrastructure

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Hung Shui Kiu and Ha Tsuen
Improvement Works at Tsuen Tsing Interchange (6087TI)

HyD
e3twr.mw@hyd.gov.hk
2762 3355
Link Detailed Design Tsuen Wan and Kwai Chung
Infrastructure Works for Developments at Kwun Tong Action Area

CEDD
enquiry@cedd.gov.hk
2762 5111
Link Construction Kwun Tong (South)
Integrated Basement for West Kowloon Cultural District - remaining works

CEDD
enquiry@cedd.gov.hk
3842-7062
Link Construction West Kowloon Cutural District
Kai Tak development – infrastructure for developments at the former runway and south apron

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Kai Tak
Kai Tak development - remaining infrastructure works for developments at the former runway and south apron

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Kai Tak
Kai Tak Development - Stage 5B Infrastructure Works at the Former North Apron Area

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Kai Tak
Kwu Tung North / FanlingNorth New Development Areas (1st phase)

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Kwu Tung North
Fanling North
Lift and Pedestrian Walkway System between Castle Peak Road and Kung Yip Street, Kwai Chung

HyD
e9-2.wd@hyd.gov.hk
3903-6654
Link Construction Kwai Chung
Lift and Pedestrian Walkway System between Lai King Hill Road and Lai Cho Road, Kwai Chung

HyD
ent3-2.wd@hyd.gov.hk
3903-6909
Link Detailed Design Kwai Chung
Lift and Pedestrian Walkway System between Saddle Ridge Garden and Sai Sha Road

HyD
ephl2-1.wd@hyd.gov.hk
3903 6658
Link Construction Ma On Shan
New Wang Tong River Bridge

HyD
ephl1-1.wd@hyd.gov.hk
3903 6813
Link Construction North-East Lantau
Pedestrian Walkway System between Hing Shing Road and Tai Wo Hau Road

HyD
ek2-3.wd@hyd.gov.hk
3903-6921
Link Construction Kwai Chung
Footbridge Connecting Morse Park No.3 and No.4 (6201TB)

HyD
e14-1.wd@hyd.gov.hk
2762 3408
Link Construction Wang Tau Hom & Tung Tau
Lift and Pedestrian Walkway System between Tai Loong Street and Wo Yi Hop Road, Kwai Chung (6203TB)

HyD
pc14-2.wd@hyd.gov.hk
2762 3417
Link Construction Kwai Chung
Retrofitting of Escalators for Footbridge across Castle Peak Road - Kwai Chung near MTR Tai Wo Hau Station Exit B

HyD
elsps2-2.wd@hyd.gov.hk
3903-6832
Link Construction Tsuen Wan
Retrofitting of Noise Barriers on Long Tin Road

HyD
e2nm.mw@hyd.gov.hk
2762-3674
Link Construction Yuen Long
Retrofitting of Noise Barriers on Po Lam Road North and Po Ning Road

HyD
e3nm.mw@hyd.gov.hk
2762-3633
Link Construction Tseung Kwan O
Retrofitting of Noise Barriers on Po Lam Road North (near King Ming Court)

HyD
e3nm.mw@hyd.gov.hk
2762 3633
Link Construction Tseung Kwan O
Site Formation and Associated Infrastructural Works for Development of Columbarium at Siu Ho Wan on Lantau Island

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Siu Ho Wan
Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Man Kam To
Fu Tei Au & Sha Ling
Site Formation and Infrastructure Works for Development at Kam Tin South, Yuen Long – Advance Works

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Kam Tin South
Site Formation and Infrastructure Works for Police Facilities in Kong Nga Po

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Fu Tei Au & Sha Ling
Site Formation and Infrastructure Works for Public Housing Development at Ka Wai Man Road and Ex-Mount Davis Cottage Area, Kennedy Town

CEDD
enquiry@cedd.gov.hk
3842-7062
Link Construction Kennedy Town & Mount Davis
Site formation and infrastructure works for public housing developments at Kam Tin South, Yuen Long

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Detailed Design & Construction Kam Tin South
Site formation and infrastructure works for public housing developments at Long Bin

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Tong Yan San Tsuen
Site Formation and Infrastructure Works for Public Housing Developments at Pok Fu Lam South

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Pok Fu Lam
Site Formation and Infrastructure Works for Public Housing Developments at Tseung Kwan O

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Tseung Kwan O
Site Formation and Infrastructure Works for Public Housing Developments at Pik Wan Road, Yau Tong

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Cha Kwo Ling, Yau Tong, Lei Yue Mun
Site formation and infrastructure works for public housing developments at Tuen Mun Central - Phase 1

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Tuen Mun
Site Formation and Infrastructural Works for Public Housing Development at Wang Chau, Yuen Long

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Ping Shan
The Establishment of an Agricultural Park in Kwu Tung South (Phase 1)

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Kwu Tung South
Trunk Road T2 and Cha Kwo Ling Tunnel

CEDD
enquiry@trunkroadt2.com
6130-8155
Link Construction Kai Tak
Cha Kwo Ling, Yau Tong, Lei Yue Mun
Tseung Kwan O Further Development - Infrastructure Works for Tseung Kwan O Stage 1 Landfill Site

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Tseung Kwan O
Tung Chung New Town Extension

CEDD
tungchung@cedd.gov.hk
2231-4408
Link Construction Tung Chung Extension Area
Tung Chung Town Centre Area
Tung Chung Valley
Wan Chai development phase II, engineering works

Construction
enquiry@cedd.gov.hk
3842-7062
Link Construction Wan Chai North
Central District (Extension)
West Kowloon Reclamation – main works (remainder) – Footbridge at the junction of Sham Mong Road and Hing Wah Street West in Sham Shui Po

CEDD
enquiry@cedd.gov.hk
3842-7062
Link Construction South West Kowloon
West Kowloon Reclamation – main works (remainder) – Footbridge at the junction of Sham Mong Road and Yen Chow Street West in Sham Shui Po

CEDD
enquiry@cedd.gov.hk
3842-7062
Link Construction South West Kowloon
Widening of Castle Peak Road - Castle Peak Bay

HyD
enquiry@cprcpb.hk
6213 6108
Link Construction Tuen Mun
Widening of Fuk Hang Tsuen Road (Between Castle Peak Road – Lam Tei and Fuk Hang Tsuen Lane)

HyD
e6-1.wd@hyd.gov.hk
3903 6814
Link Construction Tuen Mun
Widening of Western Section of Lin Ma Hang Road between Ping Yuen River and Ping Che Road
HyD
e1lmh.mw@hyd.gov.hk
2762-4922
Link

Construction Man Kam To
Ta Kwu Ling North
Widening of Tai Po Road (Sha Tin Section)

CEDD
enquiry@cedd.gov.hk
2762 5111
Link Construction Sha Tin
Yuen Long South Development Stage 1 Works and Stage 2 Works, Phase 1

CEDD
enquiry@cedd.gov.hk
2158 5680
Link Construction Tai Tong
Tong Yan San Tsuen
Site formation and infrastructure works for public housing developments at Tuen Mun Central - Phase 2

CEDD
enquiry@cedd.gov.hk
2762-5111
Link

Tendering Tuen Mun
Nim Wan Road (South) (6887TH)

HyD
e4db.mw@hyd.gov.hk
2762-3647
Link

Investigation N/A
Improvement of Lion Rock Tunnel (6876TH)

HyD
e1lrt.mw@hyd.gov.hk
3525-1486
Link Detailed Design Sha Tin
Kowloon Tong (KPA 18)
Wang Tau Hom & Tung Tau (KPA 8)
Widening of T6 Bridge of Tate's Cairn Highway (6886TH/C)

HyD
e1t6b.mw@hyd.gov.hk
2762-4981
Link Investigation Sha Tin
Improvement Works at Mui Wo, phase 2 stage 2

CEDD
enquiry@lantau.gov.hk
2231-4408
Link

Construction N/A
Site Formation and Infrastructure Works for Public Housing Development at Choi Shun Street, Sheung Shui

CEDD
enquiry@cedd.gov.hk
3468-8721
Link Tendering Fanling / Sheung Shui
Trunk Road T4 and Associated Works

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Detailed Design & Construction Sha Tin
Site Formation and Infrastructure Works for Public Housing Development at Cha Kwo Ling Village, Kowloon East

CEDD
enquiry@cedd.gov.hk
3842-7062
Link Detailed Design Cha Kwo Ling, Yau Tong, Lei Yue Mun
Site Formation and Infrastructure Works for Public Housing Developments at Chak On Road South and Pak Tin Extension, Sham Shui Po

CEDD
enquiry@cedd.gov.hk
2762-5111
Link Construction Shek Kip Mei (KPA 4)
Upgrading of Remaining Sections of Kam Tin Road and Lam Kam Road (6820TH)

HyD
e6-5.wd@hyd.gov.hk
3903 6817
Link Detailed Design Kam Tin North
Pat Heung
Shek Kong
Lam Tsuen
Footbridge near MTR Kowloon Bay Station Exit A (6200TB)

HyD
e13-2.wd@hyd.gov.hk
3903 6757
Link Construction Ngau Tau Kok and Kowloon Bay
Footbridge near Former Ngau Tau Kok Police Station and Associated Road Works (6192TB)

HyD
elsps1-1.wd@hyd.gov.hk
3903 6809
Link Detailed Design Kwun Tong
Wah Sing Street to Castle Peak Road - Kwai Chung Escalator Link System

HyD
e8-1.wd@hyd.gov.hk
3903 6818
Link Detailed Design Kwai Chung
Pedestrian Link between MTR City One Station and Prince of Wales Hospital (6209TB)

HyD
e15-1.wd@hyd.gov.hk
2762 3471
Link Detailed Design Sha Tin
Retrofitting of Noise Barriers on Tam Kon Shan Road, Tsing Yi (6858TH)

HyD
e1nm.mw@hyd.gov.hk
2762 3347
Link Investigation Tsing Yi
Retrofitting of Noise Barriers on New Clear Water Bay Road (6812TH)

HyD
pc2nm.mw@hyd.gov.hk
2762 3617
Link Detailed Design Ngau Chi Wan (KPA 12)
Retrofitting of Noise Barriers on Po Shek Wu Road (6833TH)

HyD
pc2nm.mw@hyd.gov.hk
2762 3617
Link Detailed Design Fanling / Sheung Shui
Upgrading of Deep Bay Road (6878TH)

HyD
e1db.mw@hyd.gov.hk
2762 3634
Link Detailed Design Lau Fau Shan & Tsim Bei Tsui
Ha Tsuen Fringe
Sheung Pak Nai & Ha Pak Nai