Section 4Road Tunnels and Control Areas
Complaints received by the Transport Department
| 2018 | 2019 | 2020 | |
|---|---|---|---|
| Lion Rock Tunnel | 28 | 14 | 2 |
| Aberdeen Tunnel | 19 | 27 | 11 |
| Kai Tak Tunnel | 14 | 6 | 8 |
| Shing Mun Tunnels | 12 | 15 | 13 |
| Tseung Kwan O Tunnel | 10 | 11 | 23 |
| Cross-Harbour Tunnel | 35 | 53 | 19 |
| Eastern Harbour Crossing | 46 | 24 | 24 |
| Western Harbour Crossing | 8 | 15 | 5 |
| Tate's Cairn Tunnel | 21 | 13 | 14 |
| Tai Lam Tunnel | 11 | 17 | 10 |
| Tsing Ma Control Area | 64 | 43 | 30 |
| Tsing Sha Control Area | 29 | 15 | 12 |
| Scenic Hill Tunnel | 1 | 1 | 4 |
| Airport Tunnel | 0 | 0 | |
| Central-Wan Chai Bypass Tunnel | / | 10 | 14 |
| Lung Shan Tunnel and Cheung Shan Tunnel | / | 4 | 10 |
| Tuen Mun-Chek Lap Kok Tunnel | / | / | 1 |
| General | 1 | 11 | 1 |
| Total | 299 | 279 | 201 |
| Note: |
Airport Tunnel was commissioned on 24 October 2018. Scenic Hill Tunnel was commissioned on 24 October 2018. The Central-Wan Chai Bypass Tunnel was commissioned on 20 January 2019. The Lung Shan Tunnel and Cheung Shan Tunnel were commissioned on 26 May 2019. The Tuen Mun-Chek Lap Kok Tunnel was commissioned on 27 December 2020. |
|---|