Print

Traffic Statistics - Overview

No. of Vehicles

Traffic Statistics - Overview
Notes:

The Eagle's Nest Tunnel and the Sha Tin Heights Tunnel were open to traffic on 21 March 2008. As the Eagle's Nest Tunnel and the Sha Tin Heights Tunnel are connected by the toll plaza between them and cannot be used separately, so the traffic figures are the same.

Airport Tunnel (single bound tunnel) was commissioned on 24 October 2018. As the detectors for vehicle counting started operation since February 2019, the Transport Department does not have the traffic data for 2018 and January 2019. Hence, the above figures only cover the traffic statistics for period from February 2019 to December 2020. Due to the malfunction of the vehicle detection system used for vehicle counting at Airport Tunnel during some period in 2020, the traffic figures for the affected days are excluded.

Scenic Hill Tunnel was commissioned on 24 October 2018. The above figures are the Hong Kong-Zhuhai-Macao Bridge Crossing vehicular traffic provided by Hong Kong-Zhuhai-Macao Bridge Authority.

The Central-Wan Chai Bypass Tunnel was commissioned on 20 January 2019.

The Lung Shan Tunnel and Cheung Shan Tunnel were commissioned on 26 May 2019. Due to the malfunction of the vehicle detection system used for vehicle counting at Lung Shan Tunnel and Cheung Shan Tunnel during some period in 2020, the traffic figures for the affected days are excluded.

The Tuen Mun-Chek Lap Kok Tunnel was commissioned on 27 December 2020.