Other Notices
--- The New Territories ---
Sai Kung
(Inside the brackets are the effective dates of the traffic arrangements.)
- Temporary Closure of Sai Kung Public Pier and Sai Kung Town Landing No. 3
(18.06.2026)
- Temporary Relocation of Overnight Buses and Coaches Parking Spaces on Chun Ying Street, Tseung Kwan O
(08.06.2026)
- Temporary Suspension of Bicycle Parking Spaces in Sai Kung District
(08.06.2026)
- Temporary Suspension of Coach and Motorcycle Parking Spaces at Pak Tam Chung Car Park, Sai Kung
(05.06.2026)
- Provision of Motorcycle Parking Spaces on Man Nin Street, Sai Kung
(03.06.2026)
- Temporary Arrangements of Parking Spaces at Kau Sai San Tsuen Road and Pak Sha Wan Car Park, Sai Kung
(01.06.2026)
- Extension of Temporary Suspension of Overnight Goods Vehicle Parking Spaces at Chun Yat Street, Tseung Kwan O
(31.05.2026)
- Extension of Temporary Suspension of Parking Spaces on Po Toi O Chuen Road, Sai Kung
(29.05.2026)
- Extension of Temporary Relocation of Bus Stop and GMB Stand on On Yu Road, Sai Kung
(28.05.2026)
- Extension of Temporary Arrangements of Parking Spaces at Pak Sha Wan Car Park, Sai Kung
(15.05.2026)
- Extension of Temporary Suspension of Overnight Goods Vehicle Parking Spaces at Chun Cheong Street, Tseung Kwan O
(15.04.2026)
- Temporary Relocation of Overnight Goods Vehicle Parking Spaces on Chun Yat Street, Tseung Kwan O
(08.04.2026)
- Extension of Temporary Closure of Cycle Track on On Yu Road, Sai Kung District
(31.03.2026)
- Extension of Temporary Suspension of Parking Spaces at Chun Cheong Street Car Park, Tseung Kwan O
(28.02.2026)
- Extension of Temporary Relocation of Bus Stops and GMB Stands on Po Lam Road North Northbound, Tseung Kwan O
(05.12.2025)
- Designation of New Pick-up/ Drop-off Point for People with Disabilities on Sheung Ning Road near Hang Hau Station, Tseung Kwan O
(20.08.2025)
- Provision of Motorcycle Parking Spaces at Yau Yue Wan Village Road Car Park, Tseung Kwan O
(30.06.2025)
- Introduction of New Territories Green Minibus Route No. 117A (Anderson (On Yu Road) Public Transport Terminus - Sheung Tak Public Transport Terminus)
(06.04.2025)
- Introduction of KMB Route No. 600 (Anderson (On Yu Road) Public Transport Terminus – Central (Man Kat Street Bus Terminus))
(31.03.2025)
- Introduction of KMB Route No. 19 (Anderson (On Yu Road) Public Transport Terminus - Diamond Hill (Choi Hung Road) Public Transport Interchange (Circular))
(30.03.2025)
- Launch of a New Electronic Payment System on New Territories Green Minibus (GMB) Route No. 108A
(22.12.2024)
- Fare Adjustment of N.T. GMB Route No. 105
(22.09.2024)
- Commissioning of new Kau Sai Village Pier
(21.09.2024)
- Fare Adjustment of New Territories Green Minibus Route No. 113
(01.09.2024)
- Arrangements of Metered Parking Spaces on Silverstrand Beach Road, Sai Kung
(06.08.2024)
- Fare Adjustment of New Territories Green Minibus Route Nos. 106, 107 and 115
(28.07.2024)
- Commissioning of New Parking Meters at Yan Yee Road, Sai Kung
(28.05.2024)
- Opening of Tseung Kwan O Promenade Southern Bridge
(02.02.2024)
- Commissioning of New Parking Meters at Pak Kong Road
(27.02.2023)
- Opening of Footbridge cum Cycle Track across Chui Ling Road/Chui Shin Street/Road P2 at Tseung Kwan O
(08.12.2022)
- Commissioning of New Parking Meters at King Yin Lane, Tseung Kwan O
(07.09.2021)
[Top]
Sha Tin
(Inside the brackets are the effective dates of the traffic arrangements.)
- Taxi Parking Space on Pai Tau Street, Sha Tin
(26.06.2026)
- Suspension of Metered Parking Space on On King Street, Sha Tin
(12.06.2026)
- Temporary Closure of Cycle Tracks in Sha Tin for Sha Tin Dragon Boat Race 2026
(07.06.2026)
- Extension of Temporary Relocation of Metered Parking Spaces on Chui Tin Street, Tai Wai
(02.06.2026)
- Opening of Bicycle Parking Spaces on Shing Chuen Road, Tai Wai
(15.05.2026)
- Provision of Night-Time Parking Spaces for Goods Vehicles on Shing Chuen Road, Tai Wai
(15.05.2026)
- Temporary Arrangements for Parking Spaces on Man Lam Road and Man Lai Road, Tai Wai
(09.05.2026)
- Public Light Bus (Scheduled Services) Parking Space at Lee On Bus Terminus, Ma On Shan, Sha Tin
(30.04.2026)
- Temporary Closure of Cycle Track along the Western Bank of Shing Mun River Channel, Sha Tin
(27.04.2026)
- Green Minibus Parking Space on Hin Tin Street, Tai Wai
(24.04.2026)
- Temporary Relocation of Motorcycle Parking Spaces on Shing Ho Road, Tai Wai
(23.04.2026)
- Temporary Closure of Cycle Track along the Western Bank of Shing Mun River Channel in Sha Tin
(13.04.2026)
- Change of Time Period of Parking Spaces for Goods Vehicles on On Ping Street, Sha Tin
(10.04.2026)
- Extension of Time Period of Parking Spaces for Goods Vehicles on Yuen On Street and Yuen Shun Circuit, Sha Tin
(27.03.2026)
- Green Minibus Parking Space on Lung Pak Street, Tai Wai
(20.03.2026)
- Temporary Closure of Cycle Track on Mei Tin Road, Sha Tin
(09.03.2026)
- Permanent Suspension of Pedestrian and Cycle Subway across Lion Rock Tunnel Road
(14.02.2026)
- Green Minibus Parking Space at Shui Chuen O Public Transport Interchange, Sha Tin
(06.02.2026)
- Extension of Temporary Closure of Cycle Track/Footway between Bicycle Park at Hang Tai Road and A Kung Kok Street, Sha Tin
(04.02.2026)
- Green Minibus Parking Space on Yuen Wo Road, Sha Tin
(12.01.2026)
- Temporary Arrangements for Parking Spaces on Shing Wan Road and The Unnamed Road Connecting to Chung Ling Road, Tai Wai
(03.01.2026)
- Green Minibus Parking Space at Fo Tan (Shan Mei Street) Public Transport Interchange
(28.11.2025)
- Temporary Closure of Pedestrian Subways near the Junction of Che Kung Miu Road, Lion Rock Tunnel Road and Tai Chung Kiu Road and Footpaths near Lion Rock Tunnel Road
(01.11.2025)
- Provision of Motorcycle Parking Spaces at A Kung Kok Shan Road
(15.10.2025)
- Provision of Motorcycle Parking Spaces at Hang Fai Street, Ma On Shan
(15.10.2025)
- Provision of Motorcycle Parking Spaces at On Sum Street, Sha Tin
(08.10.2025)
- Temporary Arrangement for Metered Parking Spaces on Shing Wan Road, Tai Wai
(02.10.2025)
- Opening of Ma Liu Shui New Ferry Pier, Shatin
(09.09.2025)
- Provision of Motorcycle Parking Spaces at Sui Tai Road, Ma On Shan
(27.06.2025)
- Provision of Overnight Goods Vehicle Parking Spaces on On Chun Street, Ma On Shan
(24.01.2025)
- Provision of Overnight Private Light Bus Parking Spaces on On Chun Street, Ma On Shan
(24.01.2025)
- Provision of Overnight Bus and Coach Parking Spaces on On Chun Street, Ma On Shan
(24.01.2025)
- Provision of Overnight Private Light Bus Parking Spaces on On Shing Street, Ma On Shan
(17.01.2025)
- Provision of Overnight Private Light Bus Parking Spaces on On Shing Street, Ma On Shan
(17.01.2025)
- Provision of Overnight Private Light Bus Parking Spaces on Ma On Shan Road
(17.01.2025)
- Provision of Overnight Bus and Coach Parking Spaces on On Luk Street, Ma On Shan
(17.01.2025)
- Provision of Motorcycle Parking Spaces at Sai Sha Road, Sha Tin
(30.11.2024)
- Provision of New Motorcycle Parking Spaces on Chap Wai Kon Street, Sha Tin
(31.05.2024)
- Commissioning of Spiral Roundabout in Tai Wai
(23.03.2024)
- Provision of Motorcycle Parking Spaces at the Access Road Leading from Kwong Yuen Estate to Siu Lek Yuen Road, Sha Tin
(15.12.2023)
- Provision of Motorcycle Parking Spaces on Yau On Street, Tai Wai
(11.12.2023)
- Arrangement of Metered Parking Spaces at Lok Wo Sha Lane, Ma On Shan
(09.12.2023)
- Provision of Motorcycle Parking Spaces at Lok Wo Sha Lane, Ma On Shan
(24.11.2023)
- Relocation of Bicycle Parking Spaces on Sha Kok Street near MTR Sha Tin Wai Station, Sha Tin
(28.08.2023)
- Provision of Motorcycle Parking Spaces at Hang Hong Street, Ma On Shan
(03.08.2023)
- Opening of Temporary Access Road on Ma On Shan Road near Kam Chun Court, Sha Tin
(19.03.2023)
- Commissioning of New Parking Meters at On Kwan Street, Sha Tin
(14.09.2022)
[Top]
Tai Po
(Inside the brackets are the effective dates of the traffic arrangements.)
- Suspension of Bicycle Parking Spaces on On Po Road near Shin Mei House, Fu Shin Estate, Tai Po
(15.06.2026)
- Temporary Suspension of Metered Parking Spaces in Dai Shing Street, Tai Po
(11.06.2026)
- Suspension of Bicycle Parking Spaces in Tai Po District
(08.06.2026)
- Extension of Temporary Relocation of Metered Parking Spaces on Nin Wah Road, Tai Po
(30.05.2026)
- Temporary Metered Parking Space Arrangements on Nin Wah Road, Tai Po
(11.05.2026)
- Commissioning of new Lai Chi Chong Pier and new Sham Chung Pier, Tai Po
(23.12.2025)
- Commissioning of new Sam Mun Tsai Village Pier, Tai Po
(19.11.2025)
- Commissioning of New Parking Meters in Yau King Lane Carpark, Tai Po
(26.08.2021)
- Commissioning of New Parking Meters in Dai King Street, Tai Po
(26.08.2021)
- Commissioning of New Parking Meters in Ma Wo Road, Tai Po
(26.08.2021)
- Commissioning of New Parking Meters in Nin Ming Road Temporary Carpark, Tai Po
(25.08.2021)
- Commissioning of New Parking Meters in Nin Wah Road, Tai Po
(25.08.2021)
- Commissioning of New Parking Meters in Lo Fai Road, Tai Po
(24.08.2021)
- Commissioning of New Parking Meters in Tai Po Tau Village Carpark, Tai Po
(24.08.2021)
- Commissioning of New Parking Meters in Tsing Yuen Street, Tai Po
(24.08.2021)
- Commissioning of New Parking Meters in Wan Tau Kok Lane, Tai Po
(24.08.2021)
[Top]
North
(Inside the brackets are the effective dates of the traffic arrangements.)
- Extension of Temporary Relocation of Metered Parking Spaces on Jockey Club Road, Sheung Shui
(16.06.2026)
- Opening of New Roads in Kwu Tung
(30.05.2026)
- Temporary Relocation of Motorcycle Parking Spaces on Po Ping Road, Sheung Shui
(18.05.2026)
- Commissioning of Fanling Bypass (Eastern Section)
(03.05.2026)
- Opening of Fung Ling Road, Fanling
(03.05.2026)
- Re-Opening of On Kui Street, Fanling
(03.05.2026)
- Opening of Footbridge across Sha Tau Kok Road - Lung Yeuk Tau, Fanling
(19.04.2026)
- Commissioning of New Parking Meters at Kwu Tung Road, Sheung Shui
(31.03.2026)
- Temporary Relocation of Metered Parking Spaces on Jockey Club Road, Sheung Shui
(17.03.2026)
- Commissioning of Traffic Signals at the Junction of Jockey Club Road and Yuk Tong Path, Fanling
(20.12.2025)
- Permanent Cancellation of Metered Parking Spaces and Motorcycle Parking Spaces at Choi Fat Street, Sheung Shui
(17.01.2025)
- Adjustment of Park-and-Ride Rate at Sheung Shui Po Shek Wu Estate Public Car Park
(01.01.2025)
- CLOSED ROADS ON SHA HO ROAD, SHA TAU KOK
(31.10.2024)
- Traffic Arrangements at the Public Car Park of Lin Ma Hang Road near Tak Kwu Ling San Tsuen
(19.09.2024)
- Commissioning of New Parking Meters at Ping Che Road, North District
(27.08.2024)
- Commissioning of New Parking Meters at Wo Keng Shan Road, North District
(27.08.2024)
- Commissioning of New Parking Meters at Ming Yin Road, North District
(25.06.2024)
- Partial Opening of the Unnamed Road (Road L1) Connecting the North of Junction of Ma Sik Road and Wo Tai Street, Fanling
(27.01.2024)
- Traffic Arrangements at the Public Car Park (East Wing) of Sha Tau Kok Shun Lung Street near Sha Tau Kok Public Pier
(15.12.2023)
- Commissioning of New Parking Meters at Luen Hing Street, Wo Tai Street, Wo Fung Street, Luen Shing Street and Luen Wo Road, North District
(29.11.2023)
- Temporary Traffic Arrangement on Pak Sau Road and Heung Tsz Road, Kwu Tung
(19.05.2023)
- CLOSED ROADS IN HEUNG YUEN WAI BOUNDARY CONTROL POINT
(06.02.2023)
- Cancellation of a Metered Parking Space at Sheung Shui Man Kok Village Carpark, North District
(20.10.2022)
- Cancellation of a Metered Parking Space at Sheung Shui Tung Hing Road Carpark, North District
(20.10.2022)
[Top]
Yuen Long
(Inside the brackets are the effective dates of the traffic arrangements.)
- Suspension of Bicycle Parking Spaces near T Town North and T Town South in Tin Shui Wai
(14.07.2026)
- Suspension of Bicycle Parking Spaces near Tin Yan Shopping Centre and Tin Wah Estate in Tin Shui Wai
(30.06.2026)
- Extension of Temporary Relocation of Bicycle Parking Spaces on Wang Tat Road, Yuen Long
(30.06.2026)
- Suspension of Bicycle Parking Spaces on Tak Yip Street, Yuen Long
(23.06.2026)
- Temporary Suspension of Overnight Goods Vehicle Parking Spaces on Fuk Wang Street, Yuen Long
(01.06.2026)
- Temporary Traffic Arrangement on Tin Fuk Road, Tin Shui Wai
(28.05.2026)
- Temporary Suspension of Overnight Goods Vehicle Parking Spaces on Wang Lok Street, Yuen Long
(19.05.2026)
- Permanent Closure and Reopening of Bicycle Parking Spaces on Castle Peak Road – Hung Shui Kiu
(18.05.2026)
- Temporary Relocation of Metered Parking Spaces on Town Park Road North, Yuen Long
(14.05.2026)
- Temporary Suspension of Bicycle Parking Spaces on Hung Shui Kiu Main Street near Hung Pak Road, Yuen Long
(30.04.2026)
- Extension of Temporary Relocation of Bus Stops on Long Ping Road, Yuen Long
(30.04.2026)
- Temporary Suspension of Overnight Franchised Bus Parking Spaces on Fuk Wang Street, Yuen Long
(24.04.2026)
- Temporary Suspension of Overnight Goods Vehicle Parking Spaces on Fuk Wang Street, Yuen Long
(24.04.2026)
- Temporary Suspension of Overnight Franchised Bus Parking Spaces on Fuk Yan Street, Yuen Long
(24.04.2026)
- Temporary Suspension of Overnight Goods Vehicle Parking Spaces on Wang Lok Street, Yuen Long
(21.04.2026)
- Extension of Temporary Traffic Arrangement on Pok Wai South Road, Yuen Long
(01.04.2026)
- Opening of New Road in Yuen Long
(31.03.2026)
- SPEED LIMIT ON LONG TIN ROAD, YUEN LONG
(24.03.2026)
- Extension of Temporary Traffic Arrangements on Hung Tin Road, Yuen Long
(20.03.2026)
- Extension of Temporary Relocation of Bus Stops on Wang Lok Street, Yuen Long
(13.03.2026)
- Temporary Relocation of Bus Stop on Fuk Hi Street, Yuen Long
(06.03.2026)
- Extension of Temporary Traffic Arrangement on Castle Peak Road—Hung Shui Kiu, Yuen Long
(01.03.2026)
- Extension of Temporary Suspension of Metered Parking Spaces at Lok Ma Chau Road near Lok Ma Chau Path, Yuen Long
(28.02.2026)
- Extension Of Temporary Restricted Zones On Chun Yin Square, Yuen Long
(31.01.2026)
- Extension Of Temporary Restricted Zones In Yuen Long
(31.01.2026)
- Extension of Temporary Relocation of Bicycle Parking Spaces on Wang Tat Road, Yuen Long
(31.01.2026)
- Extension of Temporary Suspension of Taxi Pick-up and Drop-off Point on Wang Tat Road , Yuen Long
(31.01.2026)
- Extension of Temporary Relocation of Motorcycle Parking Spaces on Chun Yin Square, Yuen Long
(31.01.2026)
- Extension of Temporary Suspension of Metered Parking Spaces on Ping Shun Street, Yuen Long
(31.01.2026)
- Extension of Temporary Suspension of Metered Parking Spaces on Chun Yin Square, Yuen Long
(31.01.2026)
- Extension Of Temporary Restricted Zone On Kwong Yip Street, Yuen Long
(30.01.2026)
- Extension of Temporary Relocation of Bus Stops on Fuk Hi Street, Yuen Long
(27.01.2026)
- Extension of Temporary Relocation of Bicycle Parking Spaces on Castle Peak Road – Hung Shui Kiu
(01.01.2026)
- Extension of Temporary Traffic Arrangement on Shan Pui Ho East Road, Yuen Long
(31.12.2025)
- Extension of Temporary Relocation of Overnight Goods Vehicle Parking Spaces on Wang Lok Street, Yuen Long
(31.12.2025)
- Extension of Temporary Relocation of Residents’ Service Stopping Point on Ma Wang Road, Yuen Long
(31.12.2025)
- TEMPORARY RESTRICTED ZONE ON KWONG YIP STREET, YUEN LONG
(28.11.2025)
- Temporary Traffic and Transport Arrangements on Hung Shui Kiu Main Street near Hung Shui Kiu Tin Sam Road, Yuen Long
(14.08.2025)
- Opening of Footbridge across Castle Peak Road – Yuen Long at Yuen Long
(01.02.2023)
- Cancellation of Bicycle Parking Spaces at Yau Tin East Road, Yuen Long
(01.12.2022)
- Suspension of Parking Spaces on Town Park Road North Carpark, Yuen Long
(03.10.2022)
- Commissioning of New Parking Meters on Town Park Road North, Yuen Long
(03.10.2022)
[Top]
Tuen Mun
(Inside the brackets are the effective dates of the traffic arrangements.)
[Top]
Tsuen Wan
(Inside the brackets are the effective dates of the traffic arrangements.)
- Temporary Traffic and Transport Arrangements on Route Twisk, Tsuen Wan
(14.06.2026)
- Temporary Suspension of Parking Spaces on Fu Yung Shan Road, Tsuen Wan
(08.06.2026)
- Temporary Traffic Arrangement on Kwok Shui Road, Tsuen Wan
(05.06.2026)
- Temporary Traffic Arrangement on Tai Ho Road, Tsuen Wan
(03.06.2026)
- Extension of Temporary Traffic Arrangements on Yeung Uk Road, Tsuen Wan
(01.06.2026)
- Temporary Suspension of Motorcycle Parking Spaces on On Yat Street, Tsuen Wan
(19.05.2026)
- Temporary Suspension of Parking Spaces on Fu Cheong Path, Tsuen Wan
(04.05.2026)
- Temporary Relocation of Coach Parking Spaces on Hoi Shing Road, Tsuen Wan
(31.03.2026)
- Traffic Arrangements for Commissioning of Slip Road of Tsuen Wan Road and Widened Traffic Lane on Texaco Road
(28.09.2025)
- Provision of Goods Vehicle Parking Spaces On Ma Kok Street, Tsuen Wan
(03.04.2025)
- Commissioning of New Parking Meters at Lo Wai Road, Tsuen Wan
(13.03.2025)
- Permanent Banning of U-turn Movement for Vehicles Exceeding 8 Meters in Length on Ma Kok Street, Tsuen Wan
(16.12.2024)
- Permanent Relocation of Metered Parking Spaces on Wang Wo Tsai Street and Kwu Hang Road, Tsuen Wan
(01.11.2024)
- Cancellation of Motorcycle Parking Spaces on Sham Tseng Tsuen Road, Tsuen Wan
(29.04.2024)
- Commissioning of New Parking Meters at Sham Tseng Tsuen Road, Tsuen Wan
(18.12.2023)
- Commissioning of New Parking Meters at On Yat Street, Tsuen Wan
(08.02.2023)
[Top]
Kwai Tsing
(Inside the brackets are the effective dates of the traffic arrangements.)
[Top]
Islands
(Inside the brackets are the effective dates of the traffic arrangements.)
- Commissioning of Parking Spaces and Parking Meters at Lung Shing Street, Tai O
(06.06.2026)
- Temporary Traffic Arrangement on North Lantau Highway, Lantau Island
(31.05.2026)
- Temporary Traffic and Transport Arrangements on Man Tung Road, Tung Chung
(15.05.2026)
- Temporary Relocation of Overnight Buses and Coaches Parking Spaces on Tat Tung Road, Tung Chung
(07.05.2026)
- Temporary Relocation of Motorcycle Parking Spaces on Man Tung Road, Tung Chung
(07.05.2026)
- Opening of New Footbridges across Tai O River, Lantau Island
(04.05.2026)
- Temporary Restricted Zones on Man Tung Road, Tung Chung
(30.04.2026)
- Opening of New Sai Wan Pier, Cheung Chau
(28.04.2026)
- Extension of Suspension of Metered Parking Spaces at Pui O Public Car Park on South Lantau Road, Lantau Island
(13.04.2026)
- Suspension of Parking Spaces at Lung Shing Street, Tai O
(01.04.2026)
- Temporary Restricted Zone on Ying Tung Road, Tung Chung
(16.03.2026)
- Temporary Restricted Zone on Yi Tung Road, Kam Tung Street and Wui Tung Street, Tung Chung
(17.08.2025)
- Temporary Traffic and Transport Arrangements on Ying Tung Road, Tung Chung
(31.07.2025)
- Road Tunnels (Government) Ordinance (Chapter 368)
(25.07.2025)
- Temporary Traffic and Transport Arrangements on Ying Tung Road, Tung Chung
(14.07.2025)
- Temporary Traffic Arrangement at Ying Tung Road, Tung Chung
(23.04.2025)
- Parking Space Arrangement at Lung Shing Street, Tai O
(23.08.2024)
- Commissioning of Phase 1 of Public Car Park at Yim Tin, Tai O
(28.03.2024)
- Temporary Provision of Non-metered Parking Places on Mui Wo Ferry Pier Road, Lantau Island
(08.03.2024)
- Temporary Relocation of Non-metered Parking Places on Ngan Wan Road and Mui Wo Ferry Pier Road, Mui Wo
(24.01.2024)
- Relocation of Franchised Bus Stacking Spaces on Yu Tung Road, Tung Chung
(17.02.2023)
- Relocation of goods vehicle parking spaces and coach parking spaces on Tai O Road, Lantau Island
(26.05.2017)
[Top]
Traffic Notices